Repository navigation
chore: sync with upstream v1.5.1 - #22
Conversation
|
📦 Target Release Version: |
🔍 Cherry-Pick Verification Report📦 Upstream Changes: 📋 File-by-File Analysis:
|
1 similar comment
🔍 Cherry-Pick Verification Report📦 Upstream Changes: 📋 File-by-File Analysis:
|
PR ReviewAction TypeNode-based action (uses node24 runtime, with bundled dist/ directory) Passed Checks
Failed Checks
Warnings
Security Findings
No other security vulnerabilities found. SummaryThis PR syncs with upstream bazel-contrib/publish-to-bcr v1.5.1 and removes legacy GitHub webhook/deployment infrastructure. Three blocking issues must be fixed before merge: unresolved merge conflicts in MODULE.bazel.lock and tools/format/BUILD.bazel, missing original-author copyright in LICENSE, and the unpinned actions/checkout@v7 in the newly-added E2E job. |
PR ReviewAction TypeNode-based — uses Passed Checks
Failed Checks
Warnings
Security Findings
SummaryThis PR syncs upstream changes from |
90a1b41 to
dc49b53
Compare
🔍 Cherry-Pick Verification Report📦 Upstream Changes: 📋 File-by-File Analysis:
|
017c821 to
f2101c7
Compare
Signed-off-by: Anurag Rajawat <anurag@stepsecurity.io>
f2101c7 to
25917dd
Compare
bazel-contrib/publish-to-bcr@v1.4.2...v1.5.1