Skip to content

chore(nameservice): integrate open pull requests into develop - #146

Merged
KovacZan merged 8 commits into
developfrom
factory/develop-integration-d027c425
Oct 5, 2026
Merged

KovacZan merged 8 commits into
developfrom
factory/develop-integration-d027c425

Conversation

@KovacZan

@KovacZan KovacZan commented Oct 5, 2026

Copy link
Copy Markdown
Member

Integration of open pull requests into develop

Automated integration run (base develop 2147c60277e0b6cd04fa8dacb91d898d7a753671).

Direct push to develop is rejected by branch protection (GH006: Changes must be made through a pull request), so the exact integration chain — baseline 2147c60 + one merge commit per integrated PR — is delivered through this PR. After this PR merges with Create a merge commit (or its branch simply fast-forwards), every integrated PR head becomes an ancestor of develop and GitHub will attribute the corresponding PRs as merged.

Merged (one merge commit per PR, ascending)

PR Title Merge commit
#141 chore(deps): update dependency npm-check-updates to v23 9e4fca0abea62e9063d0349aacb0db7a93818f2f
#143 chore(deps): update pnpm/action-setup action to v6 1ed0d0bb9c68121e59798c24eca0e23e49059adc
#144 chore(deps): update postgres docker tag to v18 8a23ae712ecccce6937ce2d57c90f06cfd1dcf2c
#145 chore(deps): lock file maintenance b85a2f5f2e27abc1863543baf5e3f45de4f0727f

Conflict resolutions (union of intents)

Blocked (excluded from this integration, left open for maintainers)

PR Reason
#140 latest-version@9 is ESM-only; jest-runtime (Node 24.10, no --experimental-vm-modules in repo config) throws ERR_REQUIRE_ESM in pnpm test:unit. Repo CI on the PR head fails the same UNIT step (run 37210264660). Union repair impossible: pinning 8.x discards the PR intent.
#142 typescript@7.0.2 (native compiler) exposes no JS compiler API: pnpm build (tsc), pnpm lint (typescript-eslint) and pnpm test:unit (ts-jest) all exit non-zero. Repo CI on the PR head fails every workflow (run 37241525510). Union repair impossible without net-new tooling outside both sides.

Gates

After every individual merge: pnpm install → pnpm build → pnpm lint → pnpm test:unit, all exit 0 (crypto 7 tests, api 4 tests, transactions 13 tests). Full suite re-verified at this branch head; no conflict markers in tracked files.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant