chore(deps): update nvidia-device-plugin (patch)#8808
Open
renovate[bot] wants to merge 1 commit into
Open
Azure Pipelines / AKS Linux VHD Build - PR check-in gate
failed
Jul 4, 2026 in 1h 33m 38s
Build #20260704.12_merge_170900893 had test failures
Details
- Failed: 16 (4.12%)
- Passed: 372 (95.88%)
- Other: 0 (0.00%)
- Total: 388
Annotations
Check failure on line 1666 in Build log
azure-pipelines / AKS Linux VHD Build - PR check-in gate
Build log #L1666
Script failed with exit code: 1
Check failure on line 1619 in Build log
azure-pipelines / AKS Linux VHD Build - PR check-in gate
Build log #L1619
CIS regressions detected (1). See cis-regressions.txt for details.
Check failure on line 1 in Test_Ubuntu2404_SecondaryNIC_DualStack
azure-pipelines / AKS Linux VHD Build - PR check-in gate
Test_Ubuntu2404_SecondaryNIC_DualStack
Failed
Raw output
=== RUN Test_Ubuntu2404_SecondaryNIC_DualStack
=== PAUSE Test_Ubuntu2404_SecondaryNIC_DualStack
=== CONT Test_Ubuntu2404_SecondaryNIC_DualStack
--- FAIL: Test_Ubuntu2404_SecondaryNIC_DualStack (0.00s)
Check failure on line 1 in Test_AzureLinuxV3_SecondaryNIC_DualStack
azure-pipelines / AKS Linux VHD Build - PR check-in gate
Test_AzureLinuxV3_SecondaryNIC_DualStack
Failed
Raw output
=== RUN Test_AzureLinuxV3_SecondaryNIC_DualStack
=== PAUSE Test_AzureLinuxV3_SecondaryNIC_DualStack
=== CONT Test_AzureLinuxV3_SecondaryNIC_DualStack
--- FAIL: Test_AzureLinuxV3_SecondaryNIC_DualStack (0.00s)
Loading