Skip to content

chore(deps): lock file maintenance (master) #4304

chore(deps): lock file maintenance (master)

chore(deps): lock file maintenance (master) #4304

Triggered via pull request April 13, 2026 10:35
Status Failure
Total duration 1m 4s
Artifacts

node-ci.yml

on: pull_request
Matrix: verify-matrix
workflow-result
2s
workflow-result
release  /  release
release / release
Fit to window
Zoom out
Zoom in

Annotations

6 errors
verify-matrix (22.11.0)
Process completed with exit code 1.
verify-matrix (23)
The strategy configuration was canceled because "verify-matrix._22_11_0" failed
verify-matrix (23)
The operation was canceled.
verify-matrix (20.18.0)
The strategy configuration was canceled because "verify-matrix._22_11_0" failed
verify-matrix (20.18.0)
The operation was canceled.
workflow-result
Process completed with exit code 1.